Axiros Implementation Guidelines
Generic Device Management
Best Practices For Service Centric Device Management
Content Excerpt:
Planning, Requirements Engineering
General Project Planning Considerations, Stakeholders
The Four Basic Provisioning Flows
Southbound Requirements Gathering
The (non) Relevance of PD-128
Northbound Interfacing / Protocols
Northbound Interfacing / Abstraction of Calls
Northbound Interfacing / Synchronous and Asynchronous
Level 1 Support Requirements
Level 2 Support Requirements
GDM within Service Delivery Environments
Workflows
Workflows Intra CPE
Workflows Inter CPE
Active and Passive Workflows
Westbound Interfacing / Network Elements
Fully exploiting DHCP
Mass Provisioning Actions: Risks and How to Manage Them
Data Mgmt: Real Time Aggregation vs. Redundant Storage
Scalability
Optimizing Server Throughput
Monitoring of Server
The CPE as Testhead: SLA Monitoring Directly on the Service Delivery Devices
The Relevance of X_Run_Command
A Look at SNMP
Business Router Management
Backup and Restore of CPE Configurations
Addressing of Vendor Specific Features
Personalization Through Central Subscriber Portal
Impact of Data Model Stacks on CPE Cost and Stability
Getting the most out of the devices
The Paradigm Shift - Erasing the Bottlenecks
Advanced Security Considerations
(D)DOS Attacks
CPE Spoofing
ACS Spoofing
SQL Injection
TR-069 Cross Site Attacks
Integrating Non TR-069 Devices
Legacy Devices
Mobile Devices
Integrating the Installed Base
Smart Home Sensors and Actors
Home Computers
Deployment
Testing and Performance
Testing / Use Cases
Dokumentation of Setup
Acceptance
Change Management
Putting It All Together: Premium Smart Home Solutions - Fully Managed Centrally
Please request this paper via contact @
axiros.com